Menu
Get a Quote
Geotechnical & Marine Engineering · Reg. 003824995-M

Building Strong
Foundations. Engineering
the Future.

KIKA Geotechnical & Marine Engineering Sdn. Bhd. carries forward two decades of hands-on ground and marine engineering experience — from micro piling and slope stabilisation to jetty rehabilitation — across Malaysia.

SCROLL
LOT 899-A, JLN SUNGAI CHOH
48200 RAWANG, SELANGOR
0
Years since 2006
0
Projects delivered
0
Equipment types
RM0
Paid-up capital
Our Story

From Tri Maju Engineering
to KIKA

Our journey began in 2006 with a vision of delivering dependable engineering solutions through technical expertise, integrity and quality workmanship. After operating as Shakti Tri Engineering and later Gerak Ati Resources, the business now enters a new era under second-generation leadership — rebranded as KIKA Geotechnical & Marine Engineering Sdn. Bhd.

Every project is built on trust, collaboration and technical excellence — delivering reliable engineering solutions that meet the highest standards of quality, safety and efficiency.

2006
Tri Maju Engineering
Founding team begins operations
2010s
Shakti Tri Engineering
Growth through hands-on project experience
2016
Gerak Ati Resources
Incorporated 17 March 2016 · geotechnical & marine focus
Today
KIKA Geotechnical & Marine Engineering
Second-generation leadership, modern practice
Read Our Full Story
KIKA engineers on a slope stabilisation site in Jerantut, Pahang
20 years of hands-on ground & marine engineering experience
What We Do

Ground & marine engineering,
end to end

From constrained-site micro piling to large-scale slope stabilisation and marine structural repair.

01

Micro Piling

75–300mm piles in soil, 90–250mm in rock, for high loads in constrained sites.

02

Underpinning

Strengthening existing foundations with minimal disruption to occupied buildings.

03

Slope Stabilisation

Soil nails, rock bolts and horizontal drains that arrest slope failure.

04

Ground Grouting

Permeation and compaction grouting to remediate soil and foundation support.

05

Marine & Structural

Jetty repair, pile jacketing, fender and structural rehabilitation works.

Selected Work

Projects on record,
2008 to 2026

A track record spanning dams, highways, jetties and residential foundations across Peninsular Malaysia.

Guniting works at Main Dam, Besut Terengganu
Dam Works
Main Dam, Besut Terengganu
Project LKSA helix pile installation at night
Helix Pile
Project LKSA
Jetty repair works for APMM Cukai
Marine Works
Jetty Repair, APMM Cukai
Micropiling works at Fraser Hills
Micro Piling
Fraser Hills
View All Projects

Have a project that needs solid ground?

History & Philosophy

Gerak Ati Resources traces its roots to 2006, when the founding team began operations under the name Tri Maju Engineering. Driven by a passion for engineering excellence and a commitment to practical problem-solving, the company evolved through several phases of growth, operating as Shakti Tri Engineering before being re-established as Gerak Ati Resources on 17 March 2016 — a transformation that marked a new direction focused on specialised services in the geotechnical and marine sectors.

From the beginning, our philosophy has been built on hands-on experience, technical integrity, and respect for the challenges of ground and marine engineering. These experiences shaped our approach — delivering solutions that are not only technically sound but also practical, safe, and economical.

Today, the company proudly enters a new era under the leadership of the second generation — rebranded as KIKA Geotechnical & Marine Engineering Sdn. Bhd., combining decades of practical experience with modern engineering practices and a forward-thinking approach to increasingly complex projects.

2006

Tri Maju Engineering

The founding team begins operations, driven by a passion for engineering excellence and practical problem-solving.

Growth years

Shakti Tri Engineering

The company evolves through several phases of growth, undertaking demanding projects across Malaysia.

17 March 2016

Gerak Ati Resources

Re-established with a new direction — specialised services in geotechnical and marine engineering sectors.

Today

KIKA Geotechnical & Marine Engineering Sdn. Bhd.

Second-generation leadership combines decades of experience with modern practice and technology.

Our Vision
To be a respectable construction contractor delivering beyond expectation always, and excel in many other fields in future.
Our Mission
To procure projects at competitive pricing, provide safe working conditions and deliver quality work within a reasonable time frame.
Company Information

Corporate Details

Company Name
KIKA Geotechnical & Marine Engineering Sdn. Bhd. (formerly Gerak Ati Resources)
Registration No.
003824995-M
Incorporation Date
17 March 2016
Address
Lot 899-A, Jalan Sungai Buat A Sungai Choh, 48200 Rawang, Selangor
Contact
Mr. Gosigan — +60 12-998 2308
Principal Activities
Construction, Geotechnical & Marine Services
Paid-up Capital
RM 1,000,000.00
Director
Gosigan Ravindaran
Organization

How Our Site Teams
Are Structured

Project Manager
Project Coordinator
Admin
Site Supervisor
Drilling Team Workers
Operator
General Workers
Site team performing guniting and soil nailing works at Kulim
Our People

Trained hands on
every site

Our people are at the heart of delivering quality services and solutions to our clients. To ensure every team member is equipped with the right skills, knowledge and attitude, we implement a comprehensive training programme focused on continuously enhancing technical competencies and professional development.

We strongly believe in providing practical, hands-on knowledge to empower our people to carry out their duties with confidence and excellence — staying relevant and adaptable to our clients' evolving requirements.

Capability

Equipment & Fleet

A self-owned fleet built up over two decades — sized for constrained sites and large-scale works alike.

30+

Equipment Types

From DTH hammers and micropile rigs to guniting and grouting machines.

4

Micropile Rigs

Including compact drilling frames for low-headroom, constrained sites.

100+

Units in Fleet

Hammers, pumps, drills and grouting equipment ready for deployment.

Type of EquipmentQuantity
01

Micro Piling

Micro piles have been used effectively in many applications of ground improvement — not only as working piles carrying high loads in constrained areas, but also for strengthening existing foundations. They are one of the most efficient deep foundation systems available, tolerating very large loads for their small size when socketed into rock.

With rigs of various sizes, we construct micro piles from just 75mm up to 300mm in soil, and 90mm to 250mm in rock — even in very constrained areas using our small drilling frames. Construction methods include wash (recirculation) boring with a drag bit, roller (tricone) bit for stiffer soils, or casing and shoe for drilling through buried timber and organic deposits. For rock, we employ the Down-the-Hole Hammer (DTH), a bottom-driven self-actuating hammer that can penetrate all rock types, including Grade I granite.

75–300mm
Pile diameter — soil
90–250mm
Pile diameter — rock
DTH
Down-the-hole hammer for rock
4 units
Dedicated micropile rigs
Micropiling rig at work, Fraser Hills
Micropile rig on site — Fraser Hills
02

Underpinning

Existing buildings sometimes experience excessive settlement or bearing failure under their design loads, or their load is increased through structural expansion. Because the building is already in use and space is restrained, adding micro piles to existing pile caps is often the only way to strengthen the foundation without major disruption.

Our smallest drill frame is just 1m long, 600mm wide and 2.5m high — small enough to anchor into the ground or any structure, making it useful for constrained sites with low headroom. With just the rig drilling at the pile point, connected to a modified hydraulic power-pack outside the building, we can install a micro pile almost anywhere a person can enter.

1m × 0.6m
Smallest drill frame footprint
2.5m
Low-headroom clearance
Minimal
Disruption to occupied buildings
Working beneath an existing structure at night, Project LKSA
Working beneath an existing structure — Project LKSA
03

Slope Stabilisation

A failing hillside or earth mass is "stapled" in place using inclined nails — a drilled, grouted hole with a single piece of reinforcement bar — creating a single block of earth able to hold back its overburden. Slope equilibrium remains essentially undisturbed throughout construction, making it practical for immediately arresting potentially failing slopes.

Soil Nails & Rock Bolts

Proven across Hong Kong, Taiwan, Singapore and Malaysia. Nailing works in tension, bending and shearing, reinforced with a concrete (gunite) face over woven mesh and steel plates. Rock bolts resist force through grouted steel bars embedded into bedrock using a smaller DTH hammer, 80–100mm diameter.

Horizontal Drain

Water pressure build-up from infiltration and rainfall is a leading cause of slope failure. Perforated drains, tilted slightly upward into the slope, release ground water and reduce bulk weight — typically 75mm to 100mm in diameter, angled to the client's specification.

Soil nailing and guniting works on a slope face, Kulim
Soil nailing & guniting — Junjung, Kulim
04

Ground Grouting

An economical means of remediating existing and potential geological and foundation support problems, without major disruption to structures or operations — using direct pressure injection of liquefied material into voids, cracks, fractures or cavities.

Permeation Grouting

Compaction, curtain, chemical or slurry permeation methods install a liquefied or low-mobility material, with various cement admixtures tailored to each client's needs.

Compaction Grouting

Cement grout pumped under pressure compacts surrounding soil — used for soil preparation, lifting structures, filling voids such as karstic limestone formations, and remediating sinkholes.

Grouting equipment spraying a slope face, Salak Tinggi, Sepang
Guniting works in progress — Salak Tinggi, Sepang
05

Marine & Structural Works

Beyond ground engineering, our team carries out marine works and structural rehabilitation — from jetty repair and pile jacketing to fender replacement and protective works in marine environments. Our repair of the jetty for APMM Cukai included pile jacket work, crack repair, fender replacement, roofing and painting — delivered with the same commitment to safety and quality as our ground engineering projects.

Pile Jacketing
Structural repair below waterline
Fender & Roof
Replacement & rehabilitation
Crack Repair
Concrete & steel structures
Jetty repair works at APMM Cukai
Jetty repair — APMM Cukai

Not sure which service fits your site?

Site Gallery

Selected Project Photos

Full Project Register

51 Projects, 2008–2026

Search by location, project type or client to see our complete track record.

51 projects
YearProject DescriptionMain Contractor / Owner
Get In Touch

Contact Details

Office
Lot 899-A, Jalan Sungai Buat A Sungai Choh, 48200 Rawang, Selangor
Phone
+60 12-998 2308 (Mr. Gosigan)
Business Hours
Mon – Sat, 9:00 AM – 6:00 PM (site visits by appointment)
Follow Along
Request a Quote

Tell Us About Your Project

Submitting opens your email app with the details pre-filled, addressed to kikageotechmarine@gmail.com.

✓ Your email app should now be open with your enquiry ready to send.